Interactive Bridge Toolkit
Step 3: Cl 20.1 (5th para)
Cl 20.1 (5th para) states that within 42 days after the Contractor became aware (or should have become aware) of the the event or circumstance givig rise to the Claim, the Contractor needs to submit to the Engineer fully details of the Claim including supporting particulars.