Interactive Bridge Toolkit
Step 5: 20.1 (9th para)
Cl 20.1 (9th para) If the Engineer does not respond within the 42 day timeframe, then either the Employer or Contractor may consider that the Claim is rejected by the Engineer, and either the Employer or Contractor may refer the matter to the Dispute Board.