Step 1: Preparation of Terms of Reference (TOR)

The proponent (BP) shall prepare and submit the TOR and get approval of TOR from Ministry of Physical Infrastructure and Transportation (MoPIT). The Work Schedule (TOR) shall be prepared by reviewing the documents, project information from secondary sources, interaction with stakeholders and the local stakeholders about environmental issues as required by law refer ▬►EPR Rule 5 ▬►EPR Schedule 3 for Format of TOR, ▬►ESMF Ch.-2, Table-2.4: ToR for EA Studies in Nepal Requiring Approval of MoPIT, ESMF/GESU/DoR
PROCEDURAL REQUIREMENT FOR IEE CLEARANCE