Interactive Bridge Toolkit
Step 1: Preparation of Terms of Reference (TOR)
The proponent (BP) shall prepare and submit
the TOR and get approval of TOR from Ministry of Physical Infrastructure and
Transportation (MoPIT). The Work Schedule (TOR)
shall be prepared by reviewing the documents, project information from
secondary sources, interaction with stakeholders and the local stakeholders
about environmental issues as required by law refer ▬►EPR Rule 5 ▬►EPR
Schedule 3 for Format of TOR, ▬►ESMF Ch.-2,
Table-2.4: ToR for EA Studies in Nepal Requiring
Approval of MoPIT, ESMF/GESU/DoR
PROCEDURAL REQUIREMENT FOR IEE CLEARANCE