Once relevant environmental issues are identified
including their degree of impacts, mitigation measures should be integrated in
the design of project itself. The work quantity (to possible extent) should be
incorporated in Bill of Quantities (BoQ) (an example given below), design
drawings (to possible extent), specifications (an example given below) and
conditions of contract to reduce / nullify or avoid adverse effects of such
issues. All proposed mitigation measures
shall follow the established Environmental Code of Practice/ESMF/Standard
Specification for Roads and Bridges. GESU/DoR shall also review design, BoQ,
specification specific to environmental aspects before approval being granted
to the design by the DoR refer ▬►Box2.4: Environmental and Social Safeguard and Mitigation
Measures must be included, Ch.-2 ESMF/GESU/DoR, ▬►Table 2.13:
General Environmental Codes of Practice for the SRN Program.