Step 3.5: IEE-Report Preparations

Prepare IEE report in the content suggested in Table 2.5 ESMF Ch-2 based in Schedule 5 of the EPR, Rule-7.The report shall include baseline information, identification and analysis of potential impacts, outline of major/relevant mitigation measures, environmental management plan/monitoring plan etc refer ▬► ESMF, Ch.-2.Sun-ch.2.2.1: The Procedural Steps in Road &Bridge IEEs and EIAs, Step5: Undertake the Environmental Assessment, and Table-2.5: Table of Content of an IEE Report Pertaining to SRN Sub-projects, ▬► EPR Rule 7, Schedule 5 for Format of IEE, ▬► Reference Manual for Environmental and Social Aspects of Integrated Road Development, MoPPW/DoR, 2003 ▬►PWD Part 2, Volume A, Chapter 3, Step 2.3, Table 3.5