Prepare IEE report in the content suggested in
Table 2.5 ESMF Ch-2 based in Schedule 5 of the EPR, Rule-7.The report shall
include baseline information, identification and analysis of potential impacts,
outline of major/relevant mitigation measures, environmental management
plan/monitoring plan etc refer ▬► ESMF,
Ch.-2.Sun-ch.2.2.1: The Procedural Steps in Road &Bridge IEEs and EIAs,
Step5: Undertake the Environmental Assessment, and Table-2.5: Table of Content
of an IEE Report Pertaining to SRN Sub-projects, ▬► EPR Rule 7, Schedule 5 for Format of IEE, ▬► Reference Manual
for Environmental and Social Aspects of Integrated Road Development, MoPPW/DoR,
2003 ▬►PWD
Part 2, Volume A, Chapter 3, Step 2.3, Table 3.5