Step 6: Major Bridge Maintenance Budget Estimate

The bridges requiring major maintenance shall be identified through the priority list generated by the BMS. Design and cost estimation of major maintenance shall be prepared by the Bridge Project. Division shall collect the cost estimate data from the Bridge Project at the time of ARMP preparation and present cost estimates in the standard template of ARMP to forecast the overall cost of works in the division, Refer ▬► ARMP Standard 2006 page 16