Step 7: Emergency Bridge Maintenance Budget Estimate

Establish an estimate of the amount required for emergency maintenance should such situationsarises within the division road network. Design and cost estimation shall be prepared in close coordination with the Bridge Project. Present the cost estimate in the standard template of ARMP to forecast the overall cost estimate for the division

Refer ▬► ARMP Standard 2006 page 17.