Step 12: Quality Control System
The Contractor shall be responsible for the quality of the work and shall fully implement the quality control system: including laboratory trial testing of materials, compliance testing for methods and equipment prior to the commencement of the works (involving site trials and trial sections), control testing during construction and acceptance testing on the completed works refer ▬►Standard Specification for Road and Bridge, Section 502 and 503 and Section 600.
502. CONTRACTOR RESPONSIBLE FOR THE QUALITY OF THE WORKS
All materials incorporated and all workmanship performed shall be strictly in conformity with the requirements of the Specifications and the Contractor shall be responsible for the quality of the works in the entire construction within the contract.
The Contractor shall provide, use and maintain on the Site, throughout the period of execution of the contract, a laboratory with adequate laboratory equipment operated by competent staff for carrying out tests required for the selection and control of the quality of materials and for the control of workmanship in accordance with these Specifications. The list of laboratory equipment to be procured and laboratory facilities to be provided shall be got approved from the Engineer. The Contractor shall assume that tests shall be required on all materials to be used in the works and on all finished works and on all finished works or part of works.
503. QUALITY CONTROL SYSTEM
The Quality Control System comprises the methods, procedures and organization for the Quality Control of the works. The Contractor shall implement the Quality Control System in the following sequence:
(1) Sequence
(a) Complaint testing for materials including laboratory trials,
(b) Complaint testing for methods and equipment prior to the commencement of the work,
(c) Control testing during construction,
(d) Acceptant testing on completed works or parts of the works.
The Contractor shall carry out all necessary tests and shall report to the Engineer the results of such tests before submitting materials and/or finished works or part of works to the Engineer for approval in accordance with this Specification. In certain circumstances, tests may be carried out at the place of manufacture as per the Conditions of Contracts.
For satisfying himself about the quality of the works, quality control tests shall be conducted by the Engineer himself or by any other agencies deemed fit by the Engineer. Additional tests may also be conducted where in the opinion of the Engineer such tests are needed.
Before commencement of the work, the Contractor shall demonstrate a trial run of all construction equipment for establishing their capability to achieve the laid down Specifications and tolerances to the satisfaction of the Engineer.
(2) The supply, testing and monitoring shall be in compliance with a Quality Assurance Plan, Clause 504 and the provisions in the contract.