Step 3: Site Possession

The bridge site shall be handed over to the Contractor with a joint site inspection and meeting, by the Employer and the Contractor, on the date stated in the Contract Data. A minute of the joint inspection meeting shall be prepared and circulated refer ▬► SBD (for medium contract for construction of bridge) Section IV GCC: clause 21 Possession of Site; PWD, Part-III, Medium Contract, Clause 21, Condition of Contract, page36,Contract Data item No21.1,