Interactive Bridge Toolkit
Step 5: Safety
Once the Contractor’s staff and equipment have been mobilized and the work site has been handed over to the Contractor, the safety of the site shall be the responsibility of the Contractor refer ▬► SBD (for medium contract for construction of bridge) Section IV GCC: clause 19: Safety; PWD, Part-III, Medium Contract, Clause 19, Condition of Contract, page36,